Charter completed a three-phase PCB soil remediation program across the athletic fields at Greenwich High School, which had originally been built using PCB-containing fill.

The work was split into annual summer phases so that only one field was unavailable at a time, limiting the impact on the school’s athletic programs and the surrounding neighborhood.

Charter’s Role

  • Excavation and off-site disposal of PCB-impacted soil, moved by truck to a rail transload facility and then by rail to approved disposal sites
  • Clean backfill and new subsurface stormwater collection
  • Gas-management geocomposite and an LLDPE engineered cap with drainage geocomposite
  • New synthetic turf fields, fencing and site restoration
  • A 25,000-gallon irrigation cistern, retaining wall, accessible ramp, stairs and bleachers in Phase 2
  • Targeted hotspot excavation near the school building in Phase 3

Outcomes & Benefits

Close coordination with school administrators, the Town, the Board of Health, police, students and athletic programs kept the campus running throughout. Export trucks were loaded before the morning rush and deliveries scheduled after school hours, and the school gained safe, modern fields for years to come.

Back to all
  • Greenwich High School PCB Soil Remediation
  • Greenwich High School PCB Soil Remediation 1
  • Greenwich High School PCB Soil Remediation 2
  • Greenwich High School PCB Soil Remediation 3

Project Highlights

  • Three-phase program across the high school’s athletic fields, 2021 to 2023
  • Approximately 37,000 tons of PCB-impacted soil removed by truck and rail
  • Approximately 4.8 acres of engineered cap beneath new synthetic turf fields
  • Phased so only one field was out of service at a time
  • Work sequenced around active school operations