Project

Four Hills Landfill Phase III Expansion

Landfill Cell Construction

  • City of Nashua, Division of Public Works
  • State & Local
  • Nashua, New Hampshire

Project Overview

Charter built the Phase III expansion of the Four Hills Landfill for the City of Nashua, New Hampshire. The new cell was needed because the existing Phase II municipal disposal area was approaching capacity.

Charter cleared approximately seven acres of forested land, excavated the new cell to design subgrade and constructed a double-lined containment system to protect groundwater.

Charter’s Role

  • Submittals, site-specific work plans, clearing and grubbing
  • Excavation, perimeter berms, access roads and stormwater-management infrastructure
  • A compacted clay subgrade and secondary liner of low-permeability soil, 60-mil HDPE and drainage geocomposite
  • A primary liner of geosynthetic clay liner, 60-mil HDPE and drainage geocomposite, topped with a protective sand layer
  • Primary and secondary leachate collection sumps with pump-access pipes
  • A leachate-control building to monitor levels and load leachate for off-site disposal

Outcomes & Benefits

The expansion gave the City of Nashua much-needed new disposal capacity before the existing cell reached its limit, built with a double-lined containment system to protect groundwater.

Back to all
  • Four Hills Landfill Phase III expansion, Nashua, New Hampshire
  • Four Hills Landfill Phase III expansion, Nashua, New Hampshire
  • Four Hills Landfill Phase III expansion, Nashua, New Hampshire
  • Four Hills Landfill Phase III expansion, Nashua, New Hampshire
  • Four Hills Landfill Phase III expansion, Nashua, New Hampshire
  • Four Hills Landfill Phase III expansion, Nashua, New Hampshire

Project Highlights

  • Approximately seven-acre landfill cell expansion
  • Double-lined primary and secondary leachate containment system
  • Two layers of 60-mil HDPE geomembrane plus a geosynthetic clay liner
  • Leachate sumps and a new leachate-control building
  • Substantial completion in December 2019